Bill Of Materials | Qty | Unit | Total | Notes |
CEGS Assembly and Test | 1 | ea | 22,040.00 | |
CEGS Operating Manual | 1 | ea | 0.00 | |
CO2 analyzer mounted | 1 | ea | 11,380.61 | |
Control Section LL6x1+1i+6VP+RPO | 1 | ea | 6,541.70 | |
Frame LL6x1+1i+6VP+RPO | 1 | ea | 1,313.26 | |
FT gas dual out LL | 1 | ea | 4,086.73 | |
GM Section LL6 | 1 | ea | 10,691.45 | |
IM Section LL1 +1i OB | 1 | ea | 4,279.25 | |
LN+air Section 12X | 1 | ea | 5,576.10 | |
Process Section 2CT 13C LL | 1 | ea | 20,816.78 | |
TF outlet LL | 1 | ea | 3,616.70 | |
tube furnace + fittings | 1 | ea | 11,554.49 | |
tube kit 6x1+1i+6VP-RPO | 1 | ea | 1,812.39 | |
Vacuum Section dual | 1 | ea | 38,730.38 | |
vial port 6x low level | 1 | ea | 7,477.05 | |
CEGS LL6X1+1i+6VP+RPO | 1 | ea | 149,916.89 |
Used on | Qty |
CEGS {Mines} | 1 |
CEGS (LL6X1+1i+6VP+RPO) | 1 |