Bill Of Materials | Qty | Unit | Total | Notes |
CEGS Assembly and Test | 1 | ea | 22,040.00 | |
CEGS Operating Manual | 1 | ea | 0.00 | |
Control Section LL6x1+1i+VP | 1 | ea | 5,868.15 | |
Frame LL6x1+1i+VP | 1 | ea | 1,125.24 | |
FT gas side LL | 1 | ea | 3,280.05 | |
GM Section LL6 | 1 | ea | 10,691.45 | |
IM Section LL1+1i | 1 | ea | 4,225.81 | |
LN+air Section 6x11 | 1 | ea | 3,348.82 | |
Process Section LR 13C LL | 1 | ea | 12,931.29 | |
TF outlet LL | 1 | ea | 3,616.70 | |
tube furnace + fittings | 1 | ea | 11,554.49 | |
tube kit LL6x1+1i+VP | 1 | ea | 1,334.02 | |
Vacuum Section LR | 1 | ea | 29,517.81 | |
vial port low level | 1 | ea | 2,776.57 | |
CEGS LL6x1+1i+VP | 1 | ea | 112,310.40 |
Used on | Qty |
CEGS (LL6x1+1i+VP) | 1 |
CEGS {LANL} | 1 |