Bill Of Materials | Qty | Unit | Total | Notes |
8020 corner gusset kit | 1 | ea | 14.20 | |
8020 strut smooth 1-in | 2.774 | in | 1.64 | |
CCQF kit | 1 | ea | 362.34 | |
elbow SS 3/8 x 1/4 2 ORS | 2 | ea | 106.88 | |
fitting hanger 1/4 | 1 | ea | 38.73 | |
fitting hanger top 1/4 | 1 | ea | 38.73 | |
IM slide | 2 | ea | 121.30 | |
inlet port 4BSV | 1 | ea | 1,075.86 | |
inlet port 4BSV 0 | 1 | ea | 942.55 | |
IP cooler 60mm 3X | 1 | ea | 187.22 | |
IP furnace bank 1 OB | 1 | ea | 1,086.00 | |
labor assembly/fabrication (min) | 30 | min | 27.60 | |
port bank 2 | 1 | ea | 275.56 | |
IM Section LL1 +1i OB | 1 | ea | 4,278.61 |
Used on | Qty |
CEGS LL6X1+1i+6VP+RPO | 1 |